RWE Dolgarrog – Temporary Coating Facility (Site Specific Project #3)

The hydro-electric pipeline carried water from an elevated reservoir through to the turbines located in Dolgarrog village. The pipeline was approximately 1.5km in length with a number of special fabricated fittings to follow the contour of the land. To assist the manufacture of the fittings Pipeline Protection set-up a local blast and paint shed to […]

Read more >

Epoxy-Coating

RWE Dolgarrog – Above Ground Coating (Site Specific Project #2)

Once the 2 metre diameter pipeline was fully installed and buried, the principal contractor remediated the land back to the original condition within the National Park designated area. Part of this scope of work required section of above ground pipes, including flanges, to be coated with anti-corrosive paint system which would blend into the local […]