Total – Elf Franklin (Oil and Gas)

Total’s Elf-Franklin development comprises two fields Elgin-Franklin platform to the West Franklin reservoir, which is the hottest, highest-pressure working reservoir in the world. The well was drilled to a depth of 6100m and stepped out 1.5km to tap an accumulation with a temperature of 197°C and a pressure of 1155bar. Pipeline Protection coated the external […]

Read more >

Polyurethane-Pipeline-Buried-pipelines

NACAP Land & Marine (Oil and Gas)

Opened in November 2007, the South Wales gas pipeline is capable of carrying one fifth of the natural gas consumed by the UK. The underground pipelines are 1,220mm in diameter and 316km in length. The contractor for the Milford Haven – Aberdulais section was Nacap Land & Marine joint venture. The pipeline continues onto Felindre […]

Read more >

Valve-Coating-Buried

BP Shah Deniz (Oil & Gas)

BEL Valves have successfully supplied gas control valves to the Shah Deniz I and II. The Shah Deniz field is located offshore Azerbaijan in the Caspian Sea. Operated by BP, the development is one of the largest gas developments in the world. Pipeline Protection externally coated 3 large valves with a hot applied modified epoxy […]

Read more >