Epoxy-Coating

RWE Dolgarrog – Above Ground Coating (Site Specific Project #2)

Once the 2 metre diameter pipeline was fully installed and buried, the principal contractor remediated the land back to the original condition within the National Park designated area. Part of this scope of work required section of above ground pipes, including flanges, to be coated with anti-corrosive paint system which would blend into the local environment.