RWE Dolgarrog – Temporary Coating Facility (Site Specific Project #3)

The hydro-electric pipeline carried water from an elevated reservoir through to the turbines located in Dolgarrog village. The pipeline was approximately 1.5km in length with a number of special fabricated fittings to follow the contour of the land. To assist the manufacture of the fittings Pipeline Protection set-up a local blast and paint shed to accommodate the site coating.

Hot applied polyurethane and epoxy suitable for the conveyance of raw water was applied to the steel, both internally and externally.