Total – Elf Franklin (Oil and Gas)

Total’s Elf-Franklin development comprises two fields Elgin-Franklin platform to the West Franklin reservoir, which is the hottest, highest-pressure working reservoir in the world. The well was drilled to a depth of 6100m and stepped out 1.5km to tap an accumulation with a temperature of 197°C and a pressure of 1155bar.

Pipeline Protection coated the external carrier pipes in Glass Flake Epoxy which launched the offshore pull subsea pipeline section.